This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
unpacking_and_startup [2021/04/27 16:19] brandonm [Unpacking The System] Spelling & capitalization fixes |
unpacking_and_startup [2021/04/27 16:29] (current) brandonm [System Support] Remove trailing space from link |
||
---|---|---|---|
Line 9: | Line 9: | ||
====System Placement and Electrical Requirements==== | ====System Placement and Electrical Requirements==== | ||
- | The system should be placed in an office or lab environment where temperatures are controlled (i.e an air conditioned area) Do not block the air intake on the bottom or the exhaust fan vent on the back of the case. | + | The system should be placed in an office or lab environment where temperatures are controlled (i.e. an air conditioned area). Do not block the air intake on the bottom or the exhaust fan vent on the back of the case. |
- | Under load the system will use less than 650 watts of power. It can be plugged into a shared standard | + | Under load the system will use less than 650 watts of power. It can be plugged into a shared standard |
====First Power-up==== | ====First Power-up==== | ||
- | Attach a monitor, keyboard, mouse, and LAN cable to the back of the system (These locations are labeled). | + | Attach a monitor, keyboard, mouse, and LAN cable to the back of the system (these locations are labeled). |
- | Plug the power cord into the wall. Check to make sure the power-supply switch | + | Plug the power cord into the wall. Check to make sure the power-supply switch |
====First Login==== | ====First Login==== | ||
- | Depending on your Limulus model, more **essential information** can be found on the following pages. It is highly | + | Depending on your Limulus model, more **essential information** can be found on the following pages. It is highly |
* [[ Essential Quick Start HPC Systems| Essential Quick Start HPC Systems]] | * [[ Essential Quick Start HPC Systems| Essential Quick Start HPC Systems]] | ||
* [[ Essential Quick Start Data Analytics Systems|Essential Quick Start Data Analytics Systems]] | * [[ Essential Quick Start Data Analytics Systems|Essential Quick Start Data Analytics Systems]] | ||
====System Support==== | ====System Support==== | ||
- | All systems come with initial support (one year hardware, 90-day software). During this period, you may send email to {{: | + | All systems come with initial support (one year hardware, 90-day software). During this period, you may send email to {{: |
Additional support is available: | Additional support is available: | ||
* Hardware Support: A full year of Return to Depot hardware support is provided. If you require additional hardware support please see: [[ https:// | * Hardware Support: A full year of Return to Depot hardware support is provided. If you require additional hardware support please see: [[ https:// | ||
- | * Software Support: All systems include 90 days of software support. This support can be extend to a full year (9 additional months) Please see: [[https:// | + | * Software Support: All systems include 90 days of software support. This support can be extend to a full year (9 additional months). Please see: [[https:// |
* Administration Support: Full **remote administrative support** is also available. Please see: [[https:// | * Administration Support: Full **remote administrative support** is also available. Please see: [[https:// | ||