User Tools

Site Tools


powering_up_down_nodes

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
powering_up_down_nodes [2021/04/29 17:34]
brandonm [Power Control GUI] Spelling, word, case, punctuation, and phrasing fixes; add link to FAQ section
powering_up_down_nodes [2021/04/29 17:36] (current)
brandonm [Using the Relayset Program] Punctuation, spelling, and word fixes
Line 149: Line 149:
 ====Using the Relayset Program==== ====Using the Relayset Program====
  
-The low level ''relayset'' utility is available to administrators, however it should only be used as a last resort. The node-power{on/off} utilities provide a much more controled and gracefull method of turning systems on and off.+The low-level ''relayset'' utility is available to administrators, howeverit should only be used as a last resort. The node-power{on/off} utilities provide a much more controlled and graceful method of turning systems on and off.
  
 For reference, the options to ''relayset'' are provided below.  For reference, the options to ''relayset'' are provided below. 
  
-**Important:** All Limulus systems use the following conventionn0 is connected to relay-2, n1 is connected to relay-3, and n2 is connected to relay-4. Contact Limulus Computing for larger number of nodes.+**Important:** All Limulus systems use the following conventionn0 is connected to relay-2, n1 is connected to relay-3, and n2 is connected to relay-4. Contact Limulus Computing for larger numbers of nodes.
  
 <code> <code>
powering_up_down_nodes.1619717690.txt.gz ยท Last modified: 2021/04/29 17:34 by brandonm